• Projection of independent cantilever structure followed after every 4 storey
• Construction of Stilt + 14 Storey housing blocks including 1,00,000 sq.ft. of RCC podium
• Construction of Underground Water Tank with booster pump house
• Projection of independent cantilever structure followed after every 4 storey
• Construction of Stilt + 14 Storey housing blocks including 1,00,000 sq.ft. of RCC podium
• Construction of Underground Water Tank with booster pump house
Construction of group housing building with stilt, podium and G + 14 floors including UGT.
• Essteam Surat, Gujrat
• Feedback Infra Ltd.