• Building was constructed in a hilly terrain which was challenging for the excavation of land
• G + 4 storey building including an indoor auditorium
• Construction on RCC structure and all finishing work
• Building was constructed in a hilly terrain which was challenging for the excavation of land
• G + 4 storey building including an indoor auditorium
• Construction on RCC structure and all finishing work
Construction of Academic, Indoor auditorium, and Admin Buildings, Roadwork and Gatehouse